K2 Architects
Details

TERMOMAKINA PRODUCTION CAMPUS

The Termomakina Production Campus in Düzce's Organised Industrial Zone is an integrated industrial complex comprising an administrative building, production halls, a canteen, and guesthouse. Düzce's location in a first-degree seismic zone made structural system selection the project's most critical design decision. Static analyses and cost-time optimisation led to a steel structural system, which simultaneously increased seismic resilience, accelerated assembly, and enabled flexible wide-span production areas. An architectural language built on functionality, simplicity, and structural honesty has produced an ergonomic, environmentally responsive campus.

Year / 2007

Client / Termomakina

Location / Düzce

Area / 7.500 m²